Development

Plan Review / Inspection (Services & Fees)

To obtain plan review, inspection of proposed infrastructure, or related Engineering services of the HCWA, local developers must pay appropriate fees, which vary according to the size and scope of the development, whether a residential or non-residential project is seeking water and/or sewer capacity.

HCWA Engineering Division provides Plan Review and Inspection services (see fee schedule below) for newly installed water lines, sanitary sewer lines, force mains, lift-stations, and appurtenances for new developments. 

Approved plans and a pre-construction conference with HCWA's Engineering staff are required prior to the installation of any proposed lines that are to be dedicated to the HCWA system.

HCWA also provides Plan Review and Inspection services on behalf of the City of Stockbridge. Areas that are within other City jurisdictions, which require services from HCWA, are also required to submit plans separately to HCWA. 

HCWA requires one copy of plans for original submittal.  Four copies are typically required for final approval. 

MISCELLANEOUS FEE SCHEDULE

Availability Letter (click here to download the application form)

$200.00

Fire Flow Test by HCWA (click here for complete information)

$200.00

*Fire Flow Test by Private Entity
(Requires HCWA Representative On-Site)

$125.00

Recording Fee                                                                   

$20.00

Coliform Analysis

$50.00


Checks should be made payable to Henry County Water Authority

If you have any questions regarding this information  click here to contact the Engineering Division via e-mail or call 770-914-3688 between the hours of 8:00AM – 5:00PM.

 

Bg_water_keyin

Wise Water Use

There are simple ways you and your family can make a big difference.

Learn More

Henry County Water Authority | 1695 Highway 20 West | McDonough, GA 30253 | Phone (770) 957-6659 | Fax (678) 583-2466